Export vehicle assembly depends on CKD and SKD kits arriving at the overseas plant complete and in build order, often after consolidation from many suppliers and a long ocean leg. Navo24 gives shippers and forwarders container and vessel tracking, sailing schedules, rates, load plans and reference data to keep kit flows visible.

Car factory assembly line. Opel Astra J manufactured in General Motors Manufacturing Poland plant in Gliwice.

Overview

CKD and SKD programmes move vehicles as parts rather than as finished cars. Body panels, powertrains, wiring, trim, glass and wheels are packed into export boxes and returnable racks, often at a consolidation centre near the origin port. They are stuffed into 20 ft and 40 ft high cube containers and sent by container ship, frequently via a transhipment hub, to assembly plants in Southeast Asia, India, South Africa, Latin America and North Africa. Each box is released to the line in build order, so a container works as time-phased inventory.

Problems start when one box from a kit travels on a different sailing, is rolled at a hub, or is packed against a list that does not match the contents. The plant often learns this only at unpacking. Container tracking, vessel-level schedules, port data and a load plan agreed before stuffing let planners compare the kit's arrival with the build schedule while there is still time to react.

What goes wrong today

01

Kits split across boxes and sailings

A kit is only usable when every box has landed, so one container rolled to the next vessel can idle the line even when most of the shipment is in port. Planners need to see the position of each box against the kit it belongs to, not just the booking.

02

Long transit against a fixed build plan

Transhipment connections, blank sailings and berth congestion move arrival dates by days, while the plant runs to a fixed build schedule with little buffer stock. Carrier ETAs are often revised only after the delay has happened.

03

Packing lists that disagree with boxes

Consolidating parts from many suppliers needs box sequences, gross weights and packing lists to agree with the commercial invoice and the verified gross mass. Mismatches usually surface at the destination plant or customs, when correcting them is slow and costly.

04

Regulated parts inside ordinary kits

Airbag inflators and seat belt pretensioners (UN0503, class 1.4G), lithium batteries (UN3480 and UN3481, class 9), paints and fluids make a kit a dangerous goods shipment in part. Stowage restrictions and declarations can limit which vessels and which containers a kit can use.

What Navo24 gives you

TrackingMCP

Track every box of a kit together

TrackingMCP follows containers across 240+ carriers with predicted ETAs, so planners can group boxes by kit or build batch and spot the one that is behind. Alerts on free time and demurrage cover the days between discharge and delivery to the plant.

  • Predicted ETA for each container
  • Milestone alerts by API, webhook or MCP
  • Free-time and demurrage warnings
Open TrackingMCP
SchedulesMCP

Choose sailings that protect the build slot

SchedulesMCP lists sailings with cut-offs, transhipment points and carrier on-time reliability, so a kit can be booked on one vessel rather than spread across several. Comparing connections shows where a short transhipment window risks a rolled box.

  • Cut-offs and transhipment ports per sailing
  • Carrier on-time reliability by service
  • Single-vessel booking for complete kits
Open SchedulesMCP
LoadingMCP

Plan container loads before stuffing

LoadingMCP builds a 3D plan of crates, racks and pallets in 20 ft and 40 ft high cube containers, showing the weight split, stack limits and box order. The plan can be checked against packing lists and VGM before the container leaves the consolidation centre.

  • 3D plans for crates, racks and pallets
  • Weight distribution and payload checks
  • Box sequence matched to unloading order
Open LoadingMCP
World Sea Ports

Check discharge and transhipment ports

World Sea Ports gives depths, maximum vessel size, berths and facilities for 2,900+ ports, which helps judge whether a hub or a plant-side port can take a service. Teams can compare alternative discharge ports when congestion builds.

  • Depth and maximum vessel size
  • Berths and container facilities
  • Alternative ports near the plant
Open World Sea Ports

How it works with Navo24

  1. Plan the load and box sequence

    Build a container load plan from the packing list, check gross weights against payload and record the unpacking order for the plant.

  2. Book a single-vessel sailing

    Compare sailings, cut-offs and transhipment ports, and book all boxes of a kit on the same vessel where capacity allows.

  3. Track containers by kit

    Add every container number and bill of lading to tracking and group them by kit or build batch to see any box falling behind.

  4. Prepare the plant for arrival

    Use predicted ETAs and free-time alerts to book trucks, customs slots and unpacking, and re-plan the line if a box is rolled.

Rules and standards that apply

SOLAS Chapter VI verified gross mass (VGM)

Every packed export container needs a verified gross mass declared to the carrier and terminal before loading, so kit weights must be accurate at stuffing.

CTU Code (IMO, ILO, UNECE)

Guidance on packing and securing cargo transport units, relevant for heavy racks, steel boxes and stacked crates on a long ocean leg.

IMDG Code

Governs airbag modules and inflators, lithium batteries, paints and fluids in kits, including classification, packaging, marking and segregation.

HS General Interpretative Rule 2(a)

Allows an incomplete or unassembled vehicle with the essential character of the complete one to be classified as that vehicle, which many CKD duty regimes rely on.

Incoterms 2020 (FCA, FOB, CIF, DAP)

The chosen rule decides who books the ocean leg, who bears risk at each point and who must track the kit.

Questions

What is the difference between CKD and SKD shipments?

CKD (completely knocked down) kits contain all parts unassembled, including body panels that are welded and painted at the destination plant. SKD (semi knocked down) kits arrive partly assembled, typically with the body already welded and often painted, so the plant fits the powertrain, interior and trim. Both are shipped in boxes or racks inside containers.

How are CKD kits classified for customs?

Under General Interpretative Rule 2(a) of the Harmonized System, an incomplete or unassembled vehicle that has the essential character of the complete vehicle can be classified as a vehicle, usually in heading 8703 for cars. Many countries run CKD duty schemes with their own approvals and local content conditions, so classification should be confirmed with the importing customs authority.

Do CKD kits contain dangerous goods?

Often yes. Airbag inflators and seat belt pretensioners are UN0503 (class 1.4G), lithium-ion batteries are UN3480 or UN3481 (class 9), and kits may include paints, adhesives and fluids. These parts must be classified, packed, marked and declared under the IMDG Code, and some carriers limit or refuse certain items.

Is a VGM required for CKD containers?

Yes. Under SOLAS Chapter VI, in force since 1 July 2016, the shipper must provide a verified gross mass for each packed container before it is loaded. Without it the container will not be loaded, so heavy steel racks and boxes need weighing or a documented calculation at the packing site.

How can I tell if one box of a kit is delayed?

Track each container number or bill of lading and compare predicted ETAs across all boxes of the kit. A box on a different vessel, or one rolled at a transhipment port, shows a later ETA than the rest. Grouping containers by kit makes this gap visible before arrival.