Skip to content
Navo24Navo24
Consumer goods freight data

Consumer goods.

Food and drink, apparel, furniture and household goods move in high volumes on thin margins. Navo24 keeps every box visible and shows what each lane costs and how reliable each carrier is on it.

Bottles of soda are lined up with red lids

Overview

Consumer goods move in volume, mostly in 40 ft high-cube dry containers with 2.69 m of inside height, loaded with floor-stacked cartons or palletised stock. Typical lanes run from Asia and Turkey to North Europe, the Mediterranean and the US coasts. Chilled and frozen food travels in reefers set from about minus 18 °C up to chilled set points that vary by commodity. Apparel often ships as cartons or hanging garments, furniture as bulky flat-pack. After the port, curtainsiders and box trailers carry 33 euro pallets to distribution centres.

Problems start when many boxes are managed by hand. Free time ends at the terminal while the container waits for a haulier or a delivery slot, and demurrage and detention follow. A promotion date set on a carrier ETA slips when a sailing is blanked or a port call is skipped. Cost per lane is also hard to see once surcharges are added to the base rate. Container-level tracking, sailing data and lane costs in one view close that gap.

What goes wrong today

01

Spreadsheets cannot follow every container

A few hundred boxes a month means as many carrier portals, bills of lading and status wordings to reconcile by hand. Updates are late, duplicated or missing, so nobody sees which box is stuck until a customer asks.

02

Free time expiring on low-value cargo

Demurrage starts when the full box sits in the terminal past its free time, and detention starts when it leaves the terminal and is not returned empty in time. On cargo with thin margins, a few extra days per container can cost more than the freight itself.

03

Promotions built on a moving ETA

Blank sailings, transshipment delays, port congestion and skipped calls all push arrival dates after the retail plan is locked. A late container means missed shelf dates, markdowns or air freight to recover the gap.

04

Lane cost hidden behind surcharges

The headline rate leaves out BAF, THC, peak season and congestion charges, which differ by carrier and lane. A box that is only 70 per cent full also carries the same freight cost for fewer units, which raises the landed cost per carton.

What Navo24 gives you

TrackingMCP

Follow every container on one list

TrackingMCP follows containers across 240+ carriers and shows predicted ETAs, so one view replaces the carrier portals and spreadsheets. Free-time and demurrage alerts warn the team before charges start, not after the invoice arrives.

  • One timeline per container, any carrier
  • Predicted ETA alongside the carrier ETA
  • Alerts before free time ends
Open TrackingMCP
SchedulesMCP

Pick sailings that hold their date

SchedulesMCP lists sailings, cut-offs and transshipment points, with on-time reliability by carrier. Planners can choose a service with a record on the lane and set promotion dates with a realistic buffer.

  • Cut-offs and transshipment visible at booking
  • Carrier on-time reliability by lane
  • Spot blank sailings early
Open SchedulesMCP
FreightRatesMCP

See what each lane really costs

FreightRatesMCP gives indicative FCL rates and rate history by lane, so buyers can compare against contract levels and see seasonal swings before peak. Pair the rate with reliability to judge cost per delivered carton, not only cost per box.

  • Indicative FCL rates by lane
  • Rate history across seasons
  • Compare rate against carrier reliability
Open FreightRatesMCP
LoadingMCP

Fill each box before it sails

LoadingMCP plans cartons, pallets and crates in 3D inside containers and trucks, with weight limits respected. Better cube use means fewer boxes for the same volume of flat-pack, apparel or beverages.

  • 3D plans for cartons and pallets
  • Check payload and floor use
  • Fewer part-empty containers
Open LoadingMCP

How it works with Navo24

  1. Book on reliability and cost

    Compare sailings, cut-offs and lane rates, then book the service that fits the retail calendar and the margin.

  2. Register every container

    Add box numbers or bills of lading so each container appears on one tracked list from gate-in.

  3. Re-plan on the predicted ETA

    Use the predicted arrival to move haulage, warehouse slots and promotion dates before the delay reaches the shelf.

  4. Return empties inside free time

    Act on free-time alerts, pick up and drop off at the right depot, and close the box before detention builds.

Rules and standards that apply

SOLAS VGM (Chapter VI, Regulation 2)

The shipper must provide a verified gross mass before loading, and a mismatch can leave a full container of consumer goods at the terminal.

IMO/ILO/UNECE CTU Code

Guidance on packing and securing cargo in containers, which matters for heavy furniture, liquids and stacked cartons that shift on long voyages.

Incoterms 2020

FOB, CIF and DAP decide who books the sailing, who bears risk at each point and who pays the port charges and demurrage.

EU ICS2 entry summary declaration

Advance cargo data must be filed before goods are loaded for the EU, so late or incomplete data on apparel and home goods can hold a container.

ISO 6346 container identification

The owner code, serial number and check digit make each box uniquely identifiable, which is what tracking by container number relies on.

Questions

What is the difference between demurrage and detention?

Demurrage is charged when a container stays in the port terminal beyond its free time. Detention is charged when the container has left the terminal and is not returned empty within the allowed time. Each has its own clock and daily tariff, set by the carrier or the terminal.

How can I track hundreds of containers at once?

Use a tracking tool that accepts container numbers or bills of lading across carriers and shows them on a single list. With TrackingMCP you can also use the API, webhooks or MCP, so status changes reach your own systems instead of a spreadsheet.

Why does the ETA on my container keep changing?

Carrier ETAs are often typed in by the carrier and updated only when a delay is confirmed. Blank sailings, congestion, transshipment connections and skipped port calls all move the real arrival date. A predicted ETA built on live signals reflects these changes sooner.

How many pallets fit in a 40 ft container?

A 40 ft container usually takes around 23 to 25 euro pallets (1200 by 800 mm) on the floor, depending on loading pattern and pallet height. Door width, cargo height and weight limits also matter, so a 3D load plan gives a firmer figure.

How do I compare carrier reliability on a lane?

Look at on-time performance for the specific lane and service, not a global average, which hides large differences between routes. SchedulesMCP shows carrier reliability alongside sailings, so you can pair it with the rate before booking.