Skip to content
Navo24Navo24
ItalyChina

Genoa to Dalian shipping route.

9,127 nautical miles via Suez Canal, about 27.2 days of steaming at 14 knots. Avoiding the Red Sea adds 4,848 nm.

Distance9,127 nm16,903 km
Days at sea27.214 knots
RouteSuez Canalvia Suez Canal
ECA waters1,439 nmMediterranean Sea ECA

Sea Distance Between Ports: Genoa and Dalian

Port to Port Distance on the map, along real shipping lanes.

GenoaSuez Canal · Bab-el-Mandeb · Strait of MalaccaDalian

Shipping time from Genoa to Dalian

RouteDistance12 kn14 kn18 kn
via Suez Canal (shortest)9,127 nm31.7 d27.2 d21.1 d
via Sunda Strait9,696 nm33.7 d28.9 d22.4 d
via Panama Canal13,975 nm48.5 d41.6 d32.3 d
via Cape of Good Hope14,098 nm49.0 d42.0 d32.6 d

Sea Route Distance Calculator

Open this exact route in Navo Distance: change speed, add legs, compare Suez and Cape routings, see the full map.

Reverse: Dalian to Genoa

Many carriers still avoid the Red Sea. Routed via Panama Canal, Genoa to Dalian is 13,975 nm, about 14.4 more days at 14 knots.

Ship Genoa to Dalian with Navo

Live numbers for this lane from Navo apps, updated 2026-10-31.

Sailings Genoa to Dalian

68sailings / 30 d
40-164 dtransit
5carriers
Figures for the Dalian to Genoa direction.

Freight rates ITGOA to CNDLC

$2,94320GP from
$4,14040GP from
$4,14040HC from
  • Per TEU on a 40GP$2,070
  • Scheduled transit40-164 days
  • Carriers on the lane5
  • IncludedOcean freight, before local charges

Track the shipment

Live position and arrival forecast for containers on 240+ carriers.

  • Vessel positionAIS, live
  • Arrival in DalianETA with delay alerts
  • Free timeAbout 6 days at CNDLC

Free time in Dalian

Carriers give about 6 free days at Dalian (CNDLC) before demurrage and detention start. Navo counts them on every box you track.

Ask Navo AI

Ask about this route in plain words: rates, sailings, transit, free time. Navo AI answers from live data.

Navo Mesh marketplace

Request a sea freight quote Genoa to Dalian

Post one request for this route and get offers from forwarders, carriers and AI agents on Navo Mesh. Describe the cargo once, compare the offers, pick one.

  • Posting a request is free
  • Offers from people and AI agents
  • You pay only for the offer you accept

About the Genoa to Dalian shipping route

Genoa to Dalian is a 9,127 nautical mile shipping route via Suez Canal, heading north east from Italy to China. That is 16,903 km of water against 8,563 km as the crow flies. On the way the vessel passes Suez Canal, Bab-el-Mandeb and Strait of Malacca, so canal transit fees and waiting time at the canal are part of every voyage.

Pure steaming time is 27.2 days at 14 knots. A carrier that slow steams at 12 knots to save fuel needs 31.7 days, and a fast 18 knot string about 21.1. Liner schedules on the lane quote 40 to 164 days port to port, because the services call at other ports and some transship. Over the last 30 days we counted 68 sailings by 5 carriers (CMA CGM, COSCO, Maersk, ONE and ZIM).

The shortest route goes through the Red Sea. Since attacks on shipping began there in late 2023, many carriers send ships via Panama Canal instead. That route is 13,975 nautical miles, 4,848 more, and adds about 14.4 days at 14 knots. Longer voyages burn more fuel and tie up more ships, which is why freight rates on Red Sea lanes jumped when the diversions started.

1,439 nm of the route, 16% of it, lies inside Mediterranean Sea ECA. In an emission control area ships must burn fuel with no more than 0.1% sulphur or clean the exhaust with scrubbers. That fuel costs more, and carriers add it to the ocean freight bill as a low sulphur or ECA surcharge.

Recent freight rates for ITGOA to CNDLC start at $2,943 for a 20GP and $4,140 for a 40GP. These are spot market prices from carriers that sail the lane; your quote will also include terminal handling, documentation and any bunker surcharge. At Dalian (CNDLC) carriers give about 6 free days before demurrage and detention charges start, so plan the truck or rail pickup before the box lands.

Of the 65 port to port routes from Genoa in this directory, Dalian is the 58th shortest. Closer destinations include Incheon (9,112 nm), Busan (9,042 nm) and Qingdao (8,984 nm).

FAQ

How many nautical miles from Genoa to Dalian?

The port to port distance from Genoa to Dalian is 9,127 nautical miles (16,903 km), via Suez Canal. The route passes Suez Canal, Bab-el-Mandeb, Strait of Malacca.

What is the shipping time from Genoa to Dalian?

About 27.2 days at 14 knots and 21.1 days at 18 knots of steaming, without port calls. Scheduled liner services on this lane quote 40 to 164 days.

What if the ship avoids the Red Sea?

Routed via Panama Canal, the voyage is 13,975 nm, 4,848 nm longer, about 41.6 days at 14 knots.

What are freight rates from Genoa to Dalian?

Recent spot rates for ITGOA to CNDLC start at $2,943 per 20GP and $4,140 per 40GP, before local charges. Rates change weekly.

How much of the route is in an emission control area?

1,439 nm sit inside ECA waters (Mediterranean Sea ECA), where ships burn 0.1% sulphur fuel.

Is the return route the same?

The reverse route Dalian to Genoa has its own page with the same distance and route.

More port to port distance

How we count: sea routes follow shipping lanes and canals, time is pure steaming at 14 knots without port calls. Engine navo-distance-time 0.3.0. See all sea distance between ports or the Shipping Routes Directory.

Track a container

Container, B/L or booking number. 240+ carriers, live status and ETA.